Case study · Documentary

212 hours of interviews, and eleven days of logging nobody had to do.

TeamNorthlight Documentary, Rotterdam
Project“The Last Press”, 90 min
Editors4, on Premiere Pro
PlanStudio
212 hof interviews and observational footage
−11 daysof logging across the team
6 camssynced on a single panel day
3 weeksearlier to the festival cut
An edit suite at night: one wide monitor showing a grading timeline, headphones on a stand.
The Northlight edit room, the week the stringout arrived.

“The first two days of every doc used to be logging. Now I walk in to a stringout and spend those days actually editing.”

Ines KowalczykLead editor, Northlight

The problem: a year of footage, one edit room

“The Last Press” follows the final year of a family print works in Haarlem. Northlight shot it over fourteen months: long sit-down interviews, observational days on the shop floor, and a six-camera panel at the closing party. By the time the edit started, there were 212 hours of material and a four-person team.

On their previous film the team had spent the first three weeks logging. Assistants transcribed, tagged and pulled selects while the editors waited for something to cut.

What they changed

Northlight pointed Rushfold at the project RAID on a Friday. Over the weekend it built proxies, transcribed every interview and synced the panel day, which had six cameras and no timecode.

  • Interviews arrived on Monday as transcribed, speaker-labelled clips, with retakes linked and the best take of each answer on top.
  • The director wrote a two-page paper edit. Rushfold turned it into a 2-hour stringout in Premiere, in order, on original media.
  • Producer notes from the review links became markers on the timeline instead of an email thread.
The stringout was not the film. But it was the film’s raw shape, on the first morning.

Where the time went

The total schedule stayed the same. What changed was what the team did with it.

What’s next

The next film starts the same way.

Northlight now budgets one assistant-week per film instead of three, and spends it on archive research. Their next documentary, about a Dutch ferry line, started in Rushfold before the second shoot day was over.

“We still argue about every cut,” says Ines. “We just start arguing a lot earlier.”

How Rushfold picks takes · How multicam sync works

Your next first cut is already in the footage.

Bring one real project. If Rushfold doesn’t save you a day on it, you’ll have lost nothing but an afternoon.